Inizio Registrati Login

Elenco album Ultimi arrivi Ultimi commenti Più viste Più votate Preferiti Cerca

Inizio > MARS > The Best Frames from Viking Orbiter 1 and 2
Ritorna alla pagina delle miniature FILE 76/78 Torna all'inizio Guarda foto precedente Guarda foto successiva Salta alla fine
Mars: according to Viking 1 Orbiter
NASA's Viking Mission to Mars was composed of 2 spacecrafts: Viking 1 and Viking 2, each consisting of an Orbiter and a Lander. 
The primary mission objectives were to obtain HR images of the Martian surface, characterize the structure and composition of the atmosphere and surface, and search for evidence of life. Viking 1 was launched on August 20, 1975 and arrived at Mars on June 19, 1976. The first month of orbit was devoted to imaging the surface to find appropriate landing sites for the Viking Landers. On July 20, 1976 the Viking 1 Lander separated from the Orbiter and touched down at Chryse Planitia (22,48° N, 49,97° W planetographic, 1,5 Km below the datum - 0 elevation). Viking 2 was launched September 9, 1975 and entered Mars orbit on August 7, 1976. The Viking 2 Lander touched down at Utopia Planitia (47,97° N, 225,74° W, 3 Km below the datum) on September 3, 1976. The Orbiters imaged the entire surface of Mars at a resolution of 150 to 300 meters.
Parole chiave: Mars from orbit

Mars: according to Viking 1 Orbiter

NASA's Viking Mission to Mars was composed of 2 spacecrafts: Viking 1 and Viking 2, each consisting of an Orbiter and a Lander.
The primary mission objectives were to obtain HR images of the Martian surface, characterize the structure and composition of the atmosphere and surface, and search for evidence of life. Viking 1 was launched on August 20, 1975 and arrived at Mars on June 19, 1976. The first month of orbit was devoted to imaging the surface to find appropriate landing sites for the Viking Landers. On July 20, 1976 the Viking 1 Lander separated from the Orbiter and touched down at Chryse Planitia (22,48° N, 49,97° W planetographic, 1,5 Km below the datum - 0 elevation). Viking 2 was launched September 9, 1975 and entered Mars orbit on August 7, 1976. The Viking 2 Lander touched down at Utopia Planitia (47,97° N, 225,74° W, 3 Km below the datum) on September 3, 1976. The Orbiters imaged the entire surface of Mars at a resolution of 150 to 300 meters.

vo1_022a54.jpg vo1_020a62.jpg vo1_010a56.jpg vo1_003a07.jpg vo1-PIA00300_modest.jpg
Informazioni sul file
Nome del file:vo1_010a56.jpg
Nome album:The Best Frames from Viking Orbiter 1 and 2
Valutazione (6 voti):55555(Mostra dettagli)
Parole chiave:Mars / from / orbit
Copyright:NASA - Viking 1 Project
Dimensione del file:245 KiB
Data di inserimento:Lug 11, 2006
Dimensioni:1048 x 1005 pixels
Visualizzato:60 volte
URL:https://www.lunexit.it/gallery/displayimage.php?pid=11736
Preferiti:Aggiungi ai preferiti
 
 

Powered by Coppermine Photo Gallery